Helen Porter
Hi i have found by experience the supervisor is the main person in the build in our case it was the supervisor who arranged the contractors it was a night mare a painter who told me himself he had diminished sight and painted while the floor sanders were in.A plumber who did not read the specs and didn’t put the waste master. The builders had a row with the company and walked away leaving the supervisor to put up the range hood put in the waste master and finish the shower sadly we still have the chip in the bath and the wrong fittings. The company although agreeing with us it needs to all be rectified it has never happened. So make sure your supervisor is up to the job and the company is one who cares about their brand